The Sewerage and Waterboard of New Orleans Contract No. 6267 comprises of providing an installed, functional exhaust system for an existing 20,200KW gas turbine generator unit located the Sewerage and Water Board of New Orleans’ Carrollton Water Plant. The proposed exhaust system is to replace an existing exhaust system that was damaged in December 2019. The new system is designed to direct exhaust from the existing exhaust hood, away from the turbine, towards the outside the building and up through an existing concrete frame.

SWBNO CONTRACT 6267 - TURBINE 5 EXHAUST SYSTEM

Owner: SEWERAGE AND WATERBOARD OF NEW ORLEANS
Contractor: M.R. PITTMAN GROUP, LLC
Location: NEW ORLEANS, LOUISIANA
Contract Value: $2,266,000