The general work consists of the demolition of the three Interim or Temporary Closure Structures at the end of 17th Street Canal, Orleans Avenue Canal and London Avenue Canal. The specific work consists of removal of exposed sheet piling, partial removal of scour protection, concrete capping of an I-Wall, placement of riprap, and levee restoration work.
OEB 19 INTERIM CLOSURE STRUCTURE DEMOLITION
Owner:
U.S. ARMY CORP OF ENGINEERS
Contractor:
M.R. PITTMAN GROUP, LLC
Location:
NEW ORLEANS, LA
Contract Value:
$20,177,000