The project consists of upgrade to and rehabilitation of the existing Oak Street Pump Station. Work includes demolition of existing pumps, valves, piping, electrical, controls, HVAC, rooms, grating system, supports, concrete and other components within the station. Installation of new pumps, piping, valves, HVAC, electrical gear, controls, rooms, structural modifications, upgrading the hoist, buried valve and flow meter replacement, cleaning and inspections of the existing piping.